Description
The CP pile pinching clamps are specifically designed for pitching sheet steel piling. These clamps come fitted with a 15-meter rope attached to the clamp which allows the clamp to be released from the ground. These units come fitted as standard with a shackle. Please note these clamps are not designed for extracting driven piles.





Reviews
There are no reviews yet.